At least 2 grounding points; both start and end must be connected to PE. Connection, Bridging and Bolt Requirements (By Tray Type) Each connection plate must be bridged at both ends. Cable tray may be used as the Equipment Grounding Conductor (EGC) in any installation where qualified persons will service the installed cable tray system. The metal in cable trays may be used as the EGC as per the limitations. These systems provide an efficient and adaptable solution for managing a wide range of cables, including power cables, control cables, Ethernet, and fiber optic lines. If cable is installed. In cabling projects, common wiring methods include overhead lines, cables, steel pipes, cable trays, and busbars. For systems with 110kV and above, where the neutral point is effectively grounded, the metal sheath of single-core cables should be directly connected to the substation grounding. The correct way to ground and bond a cabling system is to ensure all conductive components, such as cable trays, patch panels, racks, and metallic enclosures, are electrically connected to a single, properly installed ground point. This process needs to comply with recognised standards like BS 7671.