The simple answer to the question posed is yes, Rule 235C2b(1)(a) EXCEPTION 1 allows a mid-span clearance of 300 mm (12 in) for installations described in this Interpretation Request, i., between (1) neutral conductors in the supply space; and (2) steel messengers supporting. Aerial Cable Installation Pathway Separation When placing, installing, or rearranging communication cables and service drops, including optical fiber, copper and coax, the proper clearance requirements must be maintained. Copyright © 2008 by the Institute of Electrical and Electronics Engineers, Inc. If the transformer ratings are 75 MVA at 34. If the single core cables of 35 kV rated shield will be grounded on one end only then, according to. This article focuses on the feasibility study report of 35kV and below transmission lines and the design ideas encountered in the preliminary design, Problems and their precautions for analysis. The system is designed to have a 2% voltage drop. The cable may just lay on the concrete for 20 miles.